TorArneReinen's blog

UAN11 May 27th

The network was operative with fixed and mobile nodes. Via the MOOS middleware, the Command and Control center was able to control the system, including sending commands to AUVs and requesting high rate sensor data. MOOS was operated in secure mode. Point to point connections were of varying quality due to environmental variation. Hence multihop routing proved useful.

Command and ControlCommand and ControlSignal received on the vertical arraySignal received on the vertical arrayFolaga deployment from Research vessel GunnerusFolaga deployment from Research vessel Gunnerus

UAN11 May 26th

The additional spare modem was deployed to replace Fixed Node 1. Full network was established, including Command and Control (C2). The Folaga was deployed from Research Vessel Gunnerus and followed by HiPAP acoustic positioning system. Gunnerus also served as an artificial AUV, with a cabled transducer at 20 m depth. In this way command and response exchange with the C2 could be followed in detail.

Network layoutNetwork layout Folaga deployed from RV GunnerusFolaga deployed from RV Gunnerus

UAN11 May 25th

Folagas at sea, diving. Relatively rough weather. A fixed node was lost during recovery. Will be replaced by a spare KM modem.

 

FolagaInWaves.JPG: Folaga at seaFolagaInWaves.JPG: Folaga at sea

UAN11 May 24th

Fixed nodes with temperature sensor chains were deployed. All network layers, from the physical acustic links via IP to the MOOS database were established.   A little wind and waves.Fixed node deployment: Subsurface float being attachedFixed node deployment: Subsurface float being attached

Last node completedLast node completed Following a FolagaFollowing a Folaga

UAN11 May 23rd

The Subsurface Telemetry Unit, with its vertical hydrophone array and fiberoptical cable to shore is installed and working. Acoustical connectivity tests have been completed. Folagas were at sea.

Optical cable being deployedOptical cable being deployed Subsurface Telemetry Unit with Kongsberg modem (yellow) on its way downSubsurface Telemetry Unit with Kongsberg modem (yellow) on its way down

UAN11 Engineering tests

Engineering tests are underway. After some delays caused by the transportation companies, all subsystems are being set up and functions verified.

Weather conditions are fair.

STU assembly on pierSTU assembly on pierFolaga first wet-testFolaga first wet-testC2 screen early snapshotC2 screen early snapshot